Train was contracted by Whitecap Resources to construct a compressor and battery facility with a tank farm consisting of 6 – 5000 lb oil tanks and 2 water tanks. Train also completed the pipeline, gathering facility, loading station and all the necessary piping near Elnora, Alberta. Train was also contracted to perform numerous line locations, verification digs and abandonments, as well as numerous well pad completions and storage facilities in various locations around Alberta. The work involved locating lines, hydro-vaccing, excavation, re-coating lines and subsequent welding to repair or abandon lines. Many digs were completed in difficult areas where there were numerous lines to dig around, and very wet conditions. Train also provides routine maintenance work throughout Alberta for Whitecap.